PIARC (World Road Association), founded in 1909 and comprising 125 member governments from all over the world, is the global forum for exchange of knowledge and experience on roads, road transport policies and practices. With consultative status to the Economic and Social Council of the United Nations, the Association is contributing to a stable and sustainable global development of the road and transport sector.

This site uses cookies to optimize its operation. They allow you to securely access your personal space and download our publications. You accept their use by clicking on the "Accept" button.

Well-Prepared Projects in Low- and Middle-Income Countries - A PIARC Technical Report

The issue of good preparation of road projects was already dealt with by PIARC Taskforce 1.1 in 2020 and 2021. However, contacts with major organizations concerned, such as Multilateral Development Banks (MDBs), were made difficult during the pandemic. Also, the number of representatives from Low- and Middle-Income Countries (LMICs) in the Taskforce was very limited. These circumstances did not allow the Taskforce to consider the specific case of road projects prepared in LMICs.
PIARC therefore decided to launch a new Taskforce (Taskforce 1.3) specifically designed to deal with this issue in LMICs. This new TF began their work mid-2022. A better representation of LMICs in the Taskforce allowed to reach out to LMICs, mainly in West Africa; contacts established by TF 1.1 with SIF (Sustainable Infrastructure Foundation), the organization that promotes the project preparation platform SOURCE, were also renewed and updated. But above all, this period of time coincided with important changes being introduced by some MDBs, such as the production of guidelines to align their investment portfolio on the Paris Agreement, or the introduction of “rated criteria” in their procurement procedures. Such changes are likely to impact project preparation, procurement and financing.
The current report therefore analyzes the findings made on their own by the Taskforce, the potential impact on project preparation of changes introduced by MDBs, and also the influence of recently created organizations (Blue Dot Network, FAST-Infra) that have put a strong focus on Quality Infrastructure Investment.

Information sheet

  • Date: 2023
  • Author(s): Groupe d'Etudes 1.3 / Task Force 1.3 / Grupo de Estudio 1.3 Projets bien préparés / Well-prepared Projects / Proyectos bien preparados
  • Domain(s): Planning / Risk Management / Project Management / Road Safety / Road Network Operations
  • Type: 2023R53EN - A PIARC Technical Report
  • PIARC Ref.: 2023R53EN
  • ISBN: 978-2-84060-760-1
  • Number of pages: 45